Project Name:
| Pak Tin Estate Phases 7 & 8 - Hong Tin House, Kin Tin House, Wing Tin House, Sum Tin House, Pak Tin Commercial Centre |
Scope Of Work:
| EL and FS System |
Contract Period: |
2016/10 - 2020/12 |
Client: |
Hong Kong Housing Authority |
Architect: |
CYS Associates (HK) Ltd |
Consultant: |
Meinhardt (M&E) Ltd |
Quantity Surveyor: |
Turner & Townsend Ltd |
Main Contractor: |
Chun Wo Construction and Engineering Co Ltd |
Project Description: |
Total Construction Floor Area: 133,950 m2
- 4 Blocks with 2,030 residential flats
- 3 Floors of Non-domestic Area for Social Welfare Services including Elderly Day-care Centre, Children and Youth Development Centre, Elderly Residential Care, Dental Clinic, Market, Estate Management Office, District Management Office, Carpark and Shopping Commercial Centre
- LG3/F for Public Transport Interchange
Electrical Installation:
- 8 x 1500kVA Transformers for Residential Blocks
- 2 x 400 & 2 x 450kVA FSI Generator Sets for Residential Blocks
- 4 x 1500kVA Transformers for Social Non-domestic Area
- 400kVA FSI Generator Sets for Non-domestic Area
- 1500kVA Transformers for Public Transport Interchange
- 360kVA FSI Generator Sets for Public Transport Interchange
FS Installation:
- 5 Sets Fire Hydrant/Hose Reel System
- 1 Set Hose Reel System (PTI only)
- 11,500 Nos. Sprinkler Head in 2 Sets Sprinkler System
- 1 Set Drencher System (PTI only)
- 708 Nos. AFA Detector in 3 Sets Automatic Fire Alarm System
- 4 Sets Manual Fire Alarm System
- 2 Sets Audio/Visual Advisory System
- 4 Sets Fresh Water Supply System
- 4 Sets Flush Water Supply System
- 2 Sets Cleansing Water System
- 4 Sets F.S. Water Upfeed System
- 3 Sets Sump Pump System |