Macau
Project Name: Wynn Palace Macau
Scope Of Work: Central Chiller Plant, Site-wide BMS and Dry Fire System
Contract Period: 2014/01 - 2016/08
Client: Wynn Design Development
Architect: Wong & Ouyang (HK) Ltd
Consultant: JBA Consulting Engineers
Quantity Surveyor: -N/A-
Main Contractor: Leighton Contractors (Asia) Ltd
Project Description: - Total Construction Floor Area: 432,000 m2
- A 29-storey hotel with 1,700 nos. luxury guest rooms on top of a four level above grade and one level below grade podium.
- The podium house with dining, retail, convention, spa, entertainment, parking and related support facilities.

Central Chiller Plant Installation:
- 8 x 8,440kW Water Cooled Chiller
- 8 x 10,614kW Cooling Tower
- 5 x 1,311kW Heat Pump
- 3 x 3,920kW Hot Water Boiler
- 2 x 980kW & 1 x 2,385kW Steam Boiler
- Site-wide BMS System

FS Installation:
- 25,540 nos. AFA & Associated Monitoring Point