Hong Kong
Project Name: Penny’s Bay Quarantine Camp Phase 3A
Scope Of Work: EL, MVAC, FS and PD System (Design & Build)
Contract Period: 2020/08 - 2020/11
Client: Architectural Services Department
Architect: Leigh & Orange Ltd
Consultant: WSP (Asia) Ltd
Quantity Surveyor: Architectural Services Department
Main Contractor: Hip Hing Engineering Co Ltd
Project Description: Total Construction Floor Area: 50,000 m2
- Qty of Habitablet: 850 units
- Qty of Quarantine: 53 blocks
- Qty of Ancillary Building: 14 blocks

Electrical Installation:
- 2 x 1500kVA Transformers

MVAC Installation:
- 861 Nos. Window Type AC Unit
- 103 Sets Split Type AC Unit
- 18 Nos. VRV Outdoor Unit / 44 Nos. VRV Indoor Unit
- 43 Nos. Ventilation Fan

FS Installation:
- Total 930 Nos. AFA Detector in 1 set Automatic Fire Alarm Main Panel with 2 Sets of AFA Repeater Panel & 10 Sets of AFA Sub-panel
- 280 Nos. Manual Call Point with 400 Nos. Fire Alarm Bell & 60 Nos. Visual Fire Alarm
- 7 Nos. Street Fire Hydrant
- 320 Nos. Fire Extinguisher

PD Installation:
- 15 Sets Transfer and Booster Water Pump
- 3 Sets Submersible Pump