Project Name:
| Penny’s Bay Quarantine Camp Phase 3A |
Scope Of Work:
| EL, MVAC, FS and PD System (Design & Build) |
Contract Period: |
2020/08 - 2020/11 |
Client: |
Architectural Services Department |
Architect: |
Leigh & Orange Ltd |
Consultant: |
WSP (Asia) Ltd |
Quantity Surveyor: |
Architectural Services Department |
Main Contractor: |
Hip Hing Engineering Co Ltd |
Project Description: |
Total Construction Floor Area: 50,000 m2
- Qty of Habitablet: 850 units
- Qty of Quarantine: 53 blocks
- Qty of Ancillary Building: 14 blocks
Electrical Installation:
- 2 x 1500kVA Transformers
MVAC Installation:
- 861 Nos. Window Type AC Unit
- 103 Sets Split Type AC Unit
- 18 Nos. VRV Outdoor Unit / 44 Nos. VRV Indoor Unit
- 43 Nos. Ventilation Fan
FS Installation:
- Total 930 Nos. AFA Detector in 1 set Automatic Fire Alarm Main Panel with 2 Sets of AFA Repeater Panel & 10 Sets of AFA Sub-panel
- 280 Nos. Manual Call Point with 400 Nos. Fire Alarm Bell & 60 Nos. Visual Fire Alarm
- 7 Nos. Street Fire Hydrant
- 320 Nos. Fire Extinguisher
PD Installation:
- 15 Sets Transfer and Booster Water Pump
- 3 Sets Submersible Pump |