Project Name:
| DCS Phase III (Package D) - Electrical and Mechanical Installation |
Scope Of Work:
| MVAC and EL System |
Contract Period: |
2019/01 - 2023/01 |
Client: |
Electrical and Mechanical Services Department |
Architect: |
-N/A- |
Consultant: |
Ove Arup & Partners Hong Kong Ltd |
Quantity Surveyor: |
-N/A- |
Main Contractor: |
-N/A- |
Project Description: |
MVAC System :
- 6 x 5000 RT HV Water Cooled Chiller (Northern Plant)
- 2 x 2500 RT HV Water Cooled Chiller (Northern Plant)
- 4 x 5000 RT HV Water Cooled Chiller (Southern Plant)
- 8 x 5231 kW Cooling Tower (Northern Plant)
- 6 x 524 l/s Chilled Water Pump (Northern Plant)
- 2 x 262 l/s Chilled Water Pump (Northern Plant)
- 4 x 524 l/s Chilled Water Pump (Southern Plant)
- 4 x 530 l/s Condensing Water Pump (Northern Plant)
- 5 x 820 l/s Sea Water Pump (Sea Water Pump House)
- 1 nos. TBS (Sea Water Pump House)
- Expand the existing Chlorination system (Sea Water Pump House)
- 4 x 8000 kW PHX installation (Substation 1F2 - AirSide)
- 1 x 3000 kW PHX installation (Substation 1F2 - AirSide)
Electrical System :
- 4 x 2000kVA Transformer (Northern Plant)
- 2 x 2000kVA Transformer (Southern Plant)
- Extend the existing LVSB (Northern & Southern Plant)
- Addition of New LVSB (Northern Plant)
- Addition of New Lighting / Power / ELV Points at around 200 nos (Northern, Southern & Sea Water Plant) |