Hong Kong
Project Name: Montego Bay
Scope Of Work: FS System
Contract Period: 2020/04 - 2024/01
Client: Minmetals Land Ltd
Architect: P&T Architects and Engineers Ltd
Consultant: P&T (M&E) Ltd
Quantity Surveyor: Arcadis Hong Kong Ltd
Main Contractor: CR Construction Co Ltd
Project Description: - Total Construction Floor Area: 52,650m2
- 4 Towers with 797 residential flats
- 1 storey of basement carpark
- 2 storeys of podium with Clubhouse
- Retail shops at G/F

FS Installation:
- 3,800 Nos. Sprinkler Head
- 6 Nos. Sprinkler Control Valve Set
- 4 Nos. (Duty, Standby & Jockey) Sprinkler Pump Set
- 138 Nos. Hose Reel Set
- 204 Nos. Fire Hydrant
- 4 Nos. (Duty, Standby & Jockey) F.S. Pump Set
- 1 No. Fire Alarm Panel and 6 Nos. Repeater Panel
- 334 Nos. Smoke / Heat Detector
- 265 Nos. Detector with Sounder Base
- 446 Nos. Breakglass Unit
- 954 Nos. Alarm Bell
- 157 Nos. Visual Fire Alarm
- 97 Nos. Speaker
- 55 Nos. Directional Sign