Project Name:
| Montego Bay |
Scope Of Work:
| FS System |
Contract Period: |
2020/04 - 2024/01 |
Client: |
Minmetals Land Ltd |
Architect: |
P&T Architects and Engineers Ltd |
Consultant: |
P&T (M&E) Ltd |
Quantity Surveyor: |
Arcadis Hong Kong Ltd |
Main Contractor: |
CR Construction Co Ltd |
Project Description: |
- Total Construction Floor Area: 52,650m2
- 4 Towers with 797 residential flats
- 1 storey of basement carpark
- 2 storeys of podium with Clubhouse
- Retail shops at G/F
FS Installation:
- 3,800 Nos. Sprinkler Head
- 6 Nos. Sprinkler Control Valve Set
- 4 Nos. (Duty, Standby & Jockey) Sprinkler Pump Set
- 138 Nos. Hose Reel Set
- 204 Nos. Fire Hydrant
- 4 Nos. (Duty, Standby & Jockey) F.S. Pump Set
- 1 No. Fire Alarm Panel and 6 Nos. Repeater Panel
- 334 Nos. Smoke / Heat Detector
- 265 Nos. Detector with Sounder Base
- 446 Nos. Breakglass Unit
- 954 Nos. Alarm Bell
- 157 Nos. Visual Fire Alarm
- 97 Nos. Speaker
- 55 Nos. Directional Sign |