Project Name:
| Wing Hong Street Refuse Collection Point |
Scope Of Work:
| EL, PD, FS and HVAC System |
Contract Period: |
2019/07 - 2020/12 |
Client: |
New World Development Co Ltd |
Architect: |
Wong & Ouyang (HK) Ltd |
Consultant: |
J. Roger Preston Ltd |
Quantity Surveyor: |
N/A |
Main Contractor: |
Hip Seng Construction Co Ltd |
Project Description: |
- Total Construction Floor Area: 110m2
- 1 storey refuse collection point with M/F of plant room
- Male, Female, Disable Toilets and two DG Stores (Cat. 3 and Cat 4) at G/F
- Cleansing Water Tank & Pump Room. Hose Reel/Sprinkler Water Tank & Pump Room, Switch Room, Water Scrubber Room and Fan Room at M/F
EL Installation:
- 400A cut-out
- Lighting and Power Installation
PD Installation:
- 2 sets Cleansing Water Pumps
- 2 sets Water Pumps for Electrostatic Filter
FS Installation:
- 2 sets HR Water Pumps and 1 set Jockey Pump
- 2 sets Sprinkler Pumps and 1 set Jockey Pump
- 1 no AFA panel for DG stores
- 1 no AFA panel for Heat Detectors inside Plant Rooms
HVAC Installation:
- Water Scrubber System Installation
- Ventilation Fans c/w air duct installation
- Oscillation Fans Installation
|