Project Name: Wing Hong Street Refuse Collection Point
Scope Of Work: EL, PD, FS and HVAC System
Contract Period: 2019/07 - 2020/12
Client: New World Development Co Ltd
Architect: Wong & Ouyang (HK) Ltd
Consultant: J. Roger Preston Ltd
Quantity Surveyor: N/A
Main Contractor: Hip Seng Construction Co Ltd
Project Description: - Total Construction Floor Area: 110m2
- 1 storey refuse collection point with M/F of plant room
- Male, Female, Disable Toilets and two DG Stores (Cat. 3 and Cat 4) at G/F
- Cleansing Water Tank & Pump Room. Hose Reel/Sprinkler Water Tank & Pump Room, Switch Room, Water Scrubber Room and Fan Room at M/F

EL Installation:
- 400A cut-out
- Lighting and Power Installation

PD Installation:
- 2 sets Cleansing Water Pumps
- 2 sets Water Pumps for Electrostatic Filter

FS Installation:
- 2 sets HR Water Pumps and 1 set Jockey Pump
- 2 sets Sprinkler Pumps and 1 set Jockey Pump
- 1 no AFA panel for DG stores
- 1 no AFA panel for Heat Detectors inside Plant Rooms

HVAC Installation:
- Water Scrubber System Installation
- Ventilation Fans c/w air duct installation
- Oscillation Fans Installation