Project Name:
| The Rise |
Scope Of Work:
| PD System |
Contract Period: |
2014/01 - 2014/08 |
Client: |
Cheung Kong (Holdings) Ltd |
Architect: |
A&T Design International Ltd |
Consultant: |
WSP Hong Kong Ltd |
Quantity Surveyor: |
Cheung Kong (Holdings) Ltd |
Main Contractor: |
Chun Wo Construction & Engineering Co Ltd (Carcass) |
Project Description: |
- Total Construction Floor Area: 35,523 m2
- 1 Block of 43 storeys with 402 residential flats
- 5 storeys podium floor
PD Installation:
- 2 sets Transfer Pump
|