Project Name:
| Hang Seng Management College (Block A, B & D) |
Scope Of Work:
| MVAC System |
Contract Period: |
2012/01 - 2014/03 |
Client: |
Hang Seng Management College |
Architect: |
Wong & Ouyang (HK) Ltd |
Consultant: |
Wong & Ouyang (Building Services) Ltd |
Quantity Surveyor: |
Rider Levett Bucknall Ltd |
Main Contractor: |
Kaden Construction Ltd |
Project Description: |
- Total Construction Floor Area: 47,182 m2
- Hang Seng Management College is a self-financed university located at Shatin. Block A is a 5-storey academic building, Block B is a 4-storey sports and amenities centre, and Block D is a 8-storey academic building.
MVAC Installation:
- 2 x 3,340kW (2 x 950TR) Water Cooled Chiller
- 2 x 879kW (2 x 250TR) Water Cooled Chiller
The buildings infuses innovative many MVAC energy saving design:
- Use of district cooling system to promote sustainability
- Use of heat pumps in the indoor swimming pool for heat recovery during dehumidification process
- Use of chiller with high COP, variable speed drive fans and pumps in air-conditioning system to enhance energy efficiency
- Use of chilled ceiling design which significantly reduces annual energy consumption in Block D
- Indoor environment quality (IAQ) excellent class with desirable performance of ventilation, thermal comfort and amenities |