Project Name:
| The Signature |
Scope Of Work:
| EL, FS, PD and MVAC System |
Contract Period: |
2009/04 - 2012/07 |
Client: |
New World Development Co Ltd |
Architect: |
K&W Architects Ltd |
Consultant: |
JCL Consultants Ltd |
Quantity Surveyor: |
Davis Langdon & Seah Hong Kong Ltd |
Main Contractor: |
Hip Hing Builders Co Ltd |
Project Description: |
- Total Construction Floor Area: 18,300 m2
- 1 Block 40 storeys with 66 flats
- 1 Clubhouse
Electrical Installation:
- 3 x 1500kVA transformers
- 1 x 1250kVA FSI generator set
FS Installation:
- 1,393 nos. Sprinkler Head
- 51 nos. Heat Detector
PD Installation:
- 6 sets Water Pump
MVAC Installation:
- 1 x 92kW VRV Air-cooled chiller
- 1 x 40kW VRV Air-cooled chiller
|