Governmental Building
Project Name: West Kowloon Government Offices
Scope Of Work: HVAC, EL and ELV, FS, PD System (Design & Build)
Contract Period: 2015/07 - 2019/03
Client: Architectural Services Department
Architect: Andrew Lee King Fun & Associates Architects Ltd.
Consultant: J. Roger Preston Ltd
Quantity Surveyor: C.S. Toh & Sons & Associates Ltd.
Main Contractor: Hip Hing Joint Venture
Project Description: - Total Construction Area: 115,000m2
- Two Wings of 15 Storeys & 17 Storeys

North Tower
- G/F to 14/F (Buildings Department)

South Tower
- 10/F to 16/F (Transport Department)
- 9/F (Government Property Agency)
- 6/F to 8/F (Civil Engineering and Development Department)
- 3/F to 5/F (District Lands Offices)
- 2/F (Department of Health and Social Welfare Department)
- B/F to 1/F (Social Welfare Department)

HVAC Installation:
- 3 x 3517kW (3 x 1000TR) Water Cooled Chiller
- 1 x 3517kW (1 x 1000TR) Water Cooled Heat Recovery Chiller
- 2 x 1759kW (2 x 500TR) Water Cooled Oil Free Chiller
- 1 x 1500kW (1 x 420TR) Water to Water Heat Pump
- 4 x 4244kW + 2 x 2122kW Cooling Tower
- 60 nos. Solar Hot Water Collection Panel
- 59 nos. AHU & 6 nos. PAU
- 42 nos. CRAC unit

Electrical Installation:
- 7 x 2000kVA Transformers
- 1 x 2250kVA Generator Set
- 1 x 1875kVA Generator Set
- 1 x 900kVA Generator Set

FS Installation:
- 30,000 nos. Sprinkler Head
- 5,000 nos. AFA Detector

PD Installation:
- 6 sets booster water pump
- 15 sets submersible pump
- 3 sets transfer pump