Medical
Project Name: Tseung Kwan O Hospital Expansion
Scope Of Work: HVAC, FS and PD System (Design & Build)
Contract Period: 2009/02 - 2012/01
Client: Architectural Services Department
Architect: Simon Kwan & Associates Ltd
Consultant: Parsons Brinckerhoff (Asia) Ltd
Quantity Surveyor: C.S. Toh & Sons & Associates Ltd
Main Contractor: Hip Hing - Chun Wo Joint Venture
Project Description: - Total Construction Floor Area: 46,475 m2
- 1 block 8-storey hospital with lower ground floor and a basement floor

HVAC Installation:
- 2 x 870kW (2 x 247TR) Air Cooled Heat Recovery Chiller
- 6 x 820kW (6 x 233TR) Air Cooled Oil Free Chiller
- 2 x 870kW (2 x 247TR) Air Cooled Heat Pump
- 1 x 107kW Water-to-Water Heat Pump

FS Installation:
- 12,950 nos. Sprinkler Head
- 1,012 nos. AFA Detector

PD Installation:
- 5 sets Transfer Pump
- 6 sets VSD Booster Pump
- 4 sets Hot Water Return Pump
- 1 set Rain Water Recycling System
- 9 sets Submersible Pump