Education
Project Name: Hang Seng Management College (Block A, B & D)
Scope Of Work: MVAC System
Contract Period: 2012/01 - 2014/03
Client: Hang Seng Management College
Architect: Wong & Ouyang (HK) Ltd
Consultant: Wong & Ouyang (Building Services) Ltd
Quantity Surveyor: Rider Levett Bucknall Ltd
Main Contractor: Kaden Construction Ltd
Project Description: - Total Construction Floor Area: 47,182 m2
- Hang Seng Management College is a self-financed university located at Shatin. Block A is a 5-storey academic building, Block B is a 4-storey sports and amenities centre, and Block D is a 8-storey academic building.

MVAC Installation:
- 2 x 3,340kW (2 x 950TR) Water Cooled Chiller
- 2 x 879kW (2 x 250TR) Water Cooled Chiller

The buildings infuses innovative many MVAC energy saving design:
- Use of district cooling system to promote sustainability
- Use of heat pumps in the indoor swimming pool for heat recovery during dehumidification process
- Use of chiller with high COP, variable speed drive fans and pumps in air-conditioning system to enhance energy efficiency
- Use of chilled ceiling design which significantly reduces annual energy consumption in Block D
- Indoor environment quality (IAQ) excellent class with desirable performance of ventilation, thermal comfort and amenities